Construction Update
Exciting construction work continues at The Brannan!
These construction update photos show block walls and door frames being installed at the lower level parking. Backfilling will be done after these walls are finished.
Shoring on the upper parking level and reshoring on the lower level is also underway. Original shoring and wood decking was performed to pour the slab. After a number of weeks this shoring is removed and reshoring is installed. This process will be repeated through the entire building.